CAPACITY & ORGANIZATION

Our Capacity & Organization

Large-scale expansion capacity, state-of-the-art machinery, and Scandinavian process control for network expansion.

PERFORMANCE CAPACITY IN NUMBERS · OWN FORCES + SUBCONTRACTOR NETWORK

36

Our own civil engineering columns — ready-for-action core civil engineering units for route construction, asphalt paving, and assembly.

54

In-house fiber technicians — certified specialists for splicing, blowing in, and OTDR measurements.

120+

Qualified EU specialists — a proven, permanent network of subcontractors for maximum scalability in large-scale projects.

€15–20m+ annual project volume

High expansion capacity for large-scale projects in route construction, FTTH rollout, and infrastructure network construction.

Trinational Coordination

Project offices and scheduling in Sweden (Skåne), Denmark (Sjælland), and Germany (Berlin-Brandenburg).

PROCESS AND WORK MODEL

01 — Planning & Approval

Cable and pipe information, traffic regulation orders (VRA), customer bookings, and regional production plans.

02 — Civil Engineering & Laying

Trenching, plowing, HDD directional drilling, duct bundles, microducts, and house connections.

03 — Surface restoration

Asphalting, paving and natural stone repair according to ZTV standards with before/after documentation.

04 — Fiber Optic Technology

Splicing, OTDR/power meter measurements, and digital GIS/GPS surveying.

05 — Project Management & Controlling

Daily reporting to the client, on-site construction management, and real-time budget control.

06 — Certified Subcontractors

Qualified UE network for flexible scaling of large projects under strict AX Infra quality assurance.

MICROBIZZ & DIGITAL DOCUMENTATION

Transparency, seamlessness, and real-time tracking via our central operating system, Microbizz.

GPS survey & construction files

Mandatory digital workflows for photo-documented construction progress and GIS-compliant as-built documentation.

Security for the client

Route safety, complete traceability, and accelerated billing audits.

FLEET & MACHINERY

Wheeled excavator (20 tons) & crawler excavator (2.5–7 tons)

HDD Horizontal Directional Drilling Rigs (up to 30 t) & Cable Plow Equipment

Compact machines for tight inner-city areas

Our own splicing and service vehicles

INTERNATIONAL MANAGEMENT

GERMANY · Berlin-Brandenburg
Operational control, roll-out, route construction and management with direct Telecom & Deutsche Glasfaser project experience.

SCANDINAVIA · Sweden & Denmark
Planning, network architecture and technical supervision.

POLAND · Backoffice
Customer bookings, approval procedures and administrative disposition.